Our Services:

-All prices are based on the specs listed, actual estimate values may vary pending on your personal needs.
-All services come with additional Prep Cost of relative package size to desired service
-See Bottom For Prep Rates

​

Demolition

**All Demo is interior only and down to studs.**

​

Demo Small:

-Space:  7’X10’X8’ Room
-Estimated time: 10 billable hours
-Estimated total: $775.14


Demo Medium:

-Space: 2000 sq' 2 bed 1 bath home (Interior, down to studs)
-Estimated time: 20 billable hours
-Estimated total: $1488 or $1559.28 pending if they want dumpster or dump runs


Demo Large:

-Space: 2 story family home (Interior, down to studs)
-Estimated time: 80 billable hours
-Estimated total: $4162 or $4024.72 pending if they want dumpster or dump runs

Framing

Framing Basic:

-Space: 8’X8’ partition wall
-Estimated time: 4 billable hours
-Estimated total: $434


Framing Plus:

-Space: 7’X10’X8’ Room
-Estimated time: 9.25 billable hours
-Estimated total: $615.50

325302895_1127248257963037_313193303842685757_n.jpg
325335111_741132277433097_305465633657512278_n.jpg

Drywall

DW/ Boarding Small:

-Space: 8’X8’ partition wall
-Estimated time: 3 billable hours
-Estimated total: $331.20


DW/ Boarding Medium:

-Space: 7’X10’X8’ Room
-Estimated time: 13.25 billable hours
-Estimated total: $1073.50


DW/ Boarding Large:

-Space: 2000 sq' 2 bed 1 bath home Include ceiling and interior walls
-Estimated time: 48.5 billable hours
-Estimated total: $6788.50

Drywall Finishing

**Estimated time is only estimated billable hours and does not include drying times for materials**

​

DW FinishingSmall:

-Space: 8’X8’ partition wall
-Estimated time: 7 billable hours
-Estimated total: $504.80

 

DW Finishing Medium:

-Space: 7’X10’X8’ Room
-Estimated time: 14 billable hours
-Estimated total: $989.20
 

DW Finishing Large:

-Space: 2000 sq' 2 bed 1 bath home Include ceiling and interior walls
-Estimated time: 48 billable hours
-Estimated total: $4441.80

Tile

**Estimated time is only estimated billable hours and does not include drying times for materials**

​

Tile Small:

-Space: bathroom floor 5x8. 40 square feet total
-Estimated time: 9.25 billable hours
-Estimated total: $947.90

 

Tile Medium:

-Space: bathroom floor 5x8 and backsplash 2x4. 48 square feet total
-Estimated time: 15.25 billable hours
-Estimated total: $1359.50

 

Tile Large:

-Space: 500sq' or more of tile
-Estimated time: 46 billable hours
-Estimated total: $5,722.90

Paint

**Estimated time is only estimated billable hours and does not include drying times for materials**

​

Paint Small:

-Space: 7’X10’X8’ Room
-Estimated time: 8 billable hours
-Estimated total: $1585

 

Paint Medium:

-Space: small home 2000 sq' 2 bed 1 bath home
-Estimated time: 12 billable hours
-Estimated total: $4818.95

 

Paint Large:

-Space: 7000 Square feet Commercial space
-Estimated time: 69 billable hours
-Estimated total: $10,942.25

Finishing Carpentry

Finish Carpentry Small:

-Space: 7’X10’X8’ Room
-Estimated time: 6 billable hours
-Estimated total: $582

 

Finish Carpentry Medium:

-Space: small home 2000 sq' just base + trim
-Estimated time: 10 billable hours
-Estimated total: $1974.35


 

Finish Carpentry Large:

-Space: small home 2000 sq' base, trim and crown
-Estimated time: 12  billable hours
-Estimated total: $2640.85

325365337_580241103438498_5151318999042877846_n.jpg

Prep Costs

Prep Small:
-Space: 7’X10’X8’ room
-Estimated time: 4-5 billable hours
-Estimated total: $446.80
 

Prep Medium:

-Space: 2000 sq' 2 bed 1 bath home
-Estimated time: 10 billable hours
-Estimated total: $893.60
 

Prep Large:

-Space: Apartment, Commercial, Multi-unit
-Estimated time: 15 billable hours
-Estimated total: $1501.20

325402473_3315119568801674_5258252479923134334_n.jpg

Post-Construction

  • Certificate of Occupancy

  • As-built documentation

  • Warranty

  • Guarantee

Our Expertise

  • Our expertise lies in establishing your specific vision and bringing that to life.

  • Paint

  • Carpentry

  • Drywall

  • Tile etc

Pre-Construction

  • Design-Build

  • Scheduling

  • Estimating & Budgeting

Construction

  • Quality Control

  • Safety Management

  • Orderly working habits and practices​